Cold Spring Pond Bulkhead Removal

This bulkhead removal pilot will demonstrate a shoreline’s long-term transition from hardened shoreline structure to natural shoreline system, in a location with a history of working waterfront and public enjoyment. PEP is working with Southampton Trustees to establish a preliminary location to pilot a bulkhead removal study, otherwise known as Cold Spring Pond. Designs are looking to naturalize the shoreline while retaining working waterfront and public access priorities.

데이터와 리소스

추가 정보

필드
최종 업데이트 6월 3, 2026, 20:10 (UTC)
생성됨 5월 13, 2026, 17:50 (UTC)