Cold Spring Pond Bulkhead Removal

This bulkhead removal pilot will demonstrate a shoreline’s long-term transition from hardened shoreline structure to natural shoreline system, in a location with a history of working waterfront and public enjoyment. PEP is working with Southampton Trustees to establish a preliminary location to pilot a bulkhead removal study, otherwise known as Cold Spring Pond. Designs are looking to naturalize the shoreline while retaining working waterfront and public access priorities.

Data and Resources

Additional Info

Field Nilai
Last Updated Mei 13, 2026, 18:00 (UTC)
Dibuat Mei 13, 2026, 17:50 (UTC)